Skip to content

Jaw plates, cone liners and screen mesh: tracking wear parts at a crusher

Crushing and screening plant with conveyors at an aggregate pit

A worn jaw plate does not stop a crusher. It just makes it produce less of what you sell and more of what you do not. By the time a supervisor says the plates need changing, the plant has often been running on worn parts for weeks, with a poorer product mix and higher power and diesel per tonne.

Wear parts are a large and predictable cost at a crusher, but most plants track them only as purchase bills. This post explains how to track them by the work they do, so you can plan changes, compare suppliers and keep the right spares in the store.

The wear parts that matter

  • Jaw plates (fixed and moving) and cheek plates on the primary.
  • Mantle and concave liners on the cone crusher.
  • Rotor tips, anvils and wear plates on a VSI producing M-sand.
  • Screen mesh or panels on each deck.
  • Conveyor belts, idlers and skirt rubber.
  • Hopper and chute liners.

Each of these wears at a rate set by your rock, your settings and your feed. That is why the only useful record is one built at your own plant.

Track life in tonnes, not in days

“The jaw plates lasted two months” means little if one month was a monsoon month with half the production. Record the life of every wear part in tonnes passed through the machine, and in running hours as a second measure.

For each part fitted, record:

  1. Date fitted and the running hour reading at fitting.
  2. Part, supplier, material grade and cost.
  3. Cumulative tonnes through that machine at fitting.
  4. Date removed, hours and tonnes at removal.
  5. Reason for removal: normal wear, crack, breakage or setting problem.
  6. Whether the part was turned or reversed to use the other face.

Tonnes come from your production records. If you only weigh dispatch, use production by shift as the base. The production reporting routine gives you that figure.

What the record tells you

When to plan the next change

Once you have life in tonnes for two or three sets, you can forecast the next change from the current tonnes. That lets you schedule the change on a planned shutdown day instead of during a busy dispatch week.

Which supplier gives the lower cost per tonne

A cheaper set of plates that lasts half as long is the costlier choice. Divide the cost of each set, including fitting labour and downtime, by the tonnes it crushed. That cost per tonne is how suppliers should be compared.

Measure How to work it out What it shows
Life in tonnes Tonnes at removal less tonnes at fitting How long a part really lasts at your plant
Wear cost per tonne Part cost plus fitting cost, divided by life in tonnes The fair way to compare suppliers and grades
Early failures Parts removed for cracks or breakage before normal life Quality problems, wrong grade or tramp metal
Product mix near end of life Share of 20mm and 40mm against dust, by week When worn parts start to cost you sales

When worn parts cost you sales

As liners wear, the product mix shifts. Watch the share of your main sizes week by week. If 20mm falls and dust rises as the liners approach their usual life, the last part of that life may be costing more in lost sales than a new set would cost.

Keeping the right spares in the store

A crusher waiting three days for a mantle is losing far more than the cost of holding one in stock. For each critical wear part, set:

  • A minimum stock of one set, or more where supply is slow.
  • A reorder point based on the supplier’s usual delivery time and your forecast change date.
  • An issue rule: no part leaves the store without an issue slip against the machine.

The issue slip links the store record to the machine record, so the wear part log fills itself and the stock figure stays honest.

Frequently asked questions

Is it worth weighing the removed parts?

Yes, if you have a platform scale. Weight lost from new to removed tells you how much of the metal was used. A part removed with a lot of metal left suggests a setting or shape problem rather than wear.

Should screen mesh be tracked the same way?

Yes, deck by deck. Mesh on the top deck wears differently from the bottom deck, and a torn mesh lets oversize into a product, which leads to customer complaints.

How does this connect to breakdowns?

Many unplanned stops are wear parts that were not changed in time. Our note on breakdown and downtime logs shows how to record the hours lost.

Where this fits

Wear part tracking needs production tonnes and store issues in the same place. Quipu’s Stone Crusher and Quarry ERP brings weighbridge dispatch, stock and the plant dashboard together, with setup and training from the team in Hubli. Book a demo to see how it fits your plant.

Keep reading