Every crusher owner knows the selling price of 20mm aggregate in their area. Far fewer know what a tonne of it costs them to make. Without that figure, it is hard to say whether a discount to a large contractor is good business, whether a second shift pays, or whether the plant made money in a month when sales were high but diesel and repairs were higher.
This post sets out a simple monthly method for cost per tonne at a stone crusher that an accountant and a plant manager can agree on.
Step 1: decide which tonnes you divide by
Pick one base and keep it all year:
- Tonnes produced, from your production records, is the better base for running costs. It tells you what it cost to make what you made.
- Tonnes dispatched, from the weighbridge, is more reliable if production is not yet measured well, but it moves with stock building and selling.
If you use produced tonnes, include dust and other by-products in the total. They used the same diesel and the same crusher hours. Our note on production reporting explains how to capture them.
Step 2: collect the cost heads
| Cost head | What to include | Where it comes from |
|---|---|---|
| Raw stone | Quarry cost or bought boulders, including royalty paid on extraction | Purchase bills, royalty account |
| Power | Electricity bill including demand charges | Power bill |
| Diesel | Generator, loaders, excavators and own feed tippers | Diesel issue register |
| Wear parts | Jaw plates, liners, mesh, belts used in the month | Store issue slips |
| Repairs and maintenance | Spares, outside repair bills, lubricants | Purchase and store records |
| Labour | Wages, contractor bills, statutory contributions | Payroll and contractor bills |
| Equipment hire | Hired loaders, excavators, breakers | Hire bills against hour logs |
| Overheads | Office, supervision, insurance, licences, interest on machinery loans | Accounts |
| Depreciation | Plant and machinery, on the basis your CA uses | Fixed asset register |
Keep outward freight and selling costs out of production cost. They belong to the sale, not the tonne, and they vary by customer. Our post on diesel control explains how to split fuel between the plant and delivery trucks.
Step 3: split into cash cost and full cost
Work out two figures each month:
- Cash cost per tonne: raw stone, power, diesel, wear parts, repairs, labour and hire. This is what you spend to run the plant one more tonne.
- Full cost per tonne: cash cost plus overheads, interest and depreciation. This is what you need to earn over a year to stay in business.
The cash cost is the floor for a short-term price. The full cost is the floor for your normal price list.
Step 4: cost by product, if you need it
A crusher makes several products from one stream, so cost by product is an allocation, not a measurement. Two common approaches:
- Same cost per tonne for all products. Simple and honest, but makes dust look as costly as 20mm.
- Allocation by sales value. Spread cost in proportion to the value of each product. This gives a lower cost to dust and a higher cost to the products customers pay for.
Ask your CA which basis to use for stock valuation in your books. For pricing decisions, the sales value method is usually the more useful view.
Step 5: read the number with production
Cost per tonne falls when production rises, because many costs are fixed. A month with good cost per tonne may simply be a month with long running hours. Always look at it with:
- Tonnes produced and running hours.
- Breakdown hours, from the downtime log.
- Diesel litres per tonne and power units per tonne.
- Wear cost per tonne, from the wear parts record.
Using cost per tonne for pricing
With cash and full cost known, a discount request becomes a clear decision. If a large order at a lower rate still covers cash cost and fills idle capacity, it may be worth taking. If it falls below cash cost, every tonne sold loses money, however good the order looks.
Remember that a credit sale costs money too. A customer who pays in 90 days is effectively getting a lower price than one who pays in 15. Our note on credit sales and collections covers credit limits.
Frequently asked questions
How soon after month end can we have the figure?
If dispatch, production, diesel and store issues are recorded daily, within a day or two of closing the books. Our post on the month-end close shows how to shorten that.
Should royalty be part of cost?
Yes, royalty paid on the mineral you extract or buy is part of the cost of the raw material. Keep a separate line for it so you can see changes in royalty rates clearly.
Where this fits
Cost per tonne is only as good as the tonnes and the costs behind it. Quipu’s Stone Crusher and Quarry ERP takes dispatch weights straight from the weighbridge, keeps the royalty account and double-entry ledgers in one place, and shows the plant position on a dashboard. Book a demo to see it.
